EMI/OEE Implementation

EMI/OEE Implementation man smiling on capcorp bottling line

23 Jan EMI/OEE Implementation

We worked with CBC to implement an EMI system, resulting in increased plant efficiency by 5 OEE (overall equipment efficiency) points. This system also allowed users to drill down into all metrics measured by system to find and resolve issues and identify efficiency opportunities.

The Central America Bottling Corporation (CBC) is the largest beverage distributor in Central America. Our team helped them implement Epicor Informance EMI. The Informance system’s wide range of tools and analytics allows businesses to analyze information and help engineers work on optimizing manufacturing lines. Informance dashboards for each line operator help them measure their line’s performance in real-time helping them optimize production.